The City of Mesa invites to you an online virtual meeting to learn more about the Broadway Road Phase 1 project. The City is in the design phase, which involves a full reconstruction along Broadway Road from Lesueur to Spur (Mesa Drive to Stapley Drive).
The proposed scope of work includes replacing pavement, curb/gutter, sidewalk and bike lanes. The water and gas lines and storm drains will be updated. Existing private irrigation lines on the south side of Broadway Road will be relocated. The City's existing electric overhead lines on Broadway Road (west of Horne) will be converted to underground, as well as the existing SRP overhead lines (east of Horne). Improvements at the intersection of Broadway Road/Stapley Drive will consist of all new right turn lanes. Design is anticipated to be completed Spring 2022 and construction completed Spring 2024.
JOIN US FOR A SHORT PRESENTATION FOLLOWED BY A QUESTIONS AND ANSWER SESSION!
Date: Wednesday, Nov. 18, 2020
Time: 6 p.m. to 7 p.m.
Location: online at mesaaz.gov/engineering
If you have any questions or concerns regarding this project, please contact Curt Albright, Michele Arrollado, or Lucy Lopez with the City of Mesa Engineering Public Relations Department at (480) 644-3800.
Si usted tiene preguntas de este proyecto, favor de llamar a Lucy Lopez, con la Ciudad de Mesa al (480) 644-4431. Habra personal de habla espanl durante la reuni?n para responder a sus preguntas.
Engineering
Contact: Curt Albright
Tel. 480-644-5488
curt.albright@mesaaz.gov